Checkmark
BRE 365 Compliant Testing for Planning Approval

BRE 365 Soakaway Testing

Fast, accurate infiltration testing to support your planning application. Get the information your drainage design needs.
Pocket Watch
Fast Turnaround
Test Passed
Planning-Ready Reports
Address
UK Nationwide
Overview

What is BRE 365 Soakaway Testing?

BRE 365 is the recognised industry standard for measuring how quickly water infiltrates into the ground. It allows planners and drainage engineers to determine whether soakaways are a viable surface water drainage solution for your site.

The test involves excavating a trial pit, filling it with water, and measuring how quickly the water drains into the surrounding soil. The resulting infiltration rate directly informs soakaway feasibility, sizing, and design.

Most Local Planning Authorities and Building Control departments require BRE 365 testing before approving soakaway drainage. Without compliant results, drainage strategies are often rejected, leading to redesigns, objections, and costly project delays.

Blur
Infiltration Rate
Measures how fast water soaks into your ground, the key factor in soakaway design and viability.
Inspection
Planning Compliance
Provides the documented evidence planners and SuDS officers expect to see.
Last 24 Hours
Avoid Delays
Getting it right first time reduces objections, redesigns, and stalled applications.
The Process

Our BRE 365 Testing Approach

A straightforward, professional process designed to get you the results you need, quickly.
01

Site Visit & Setup

We attend site with all required equipment, assess ground conditions, and confirm appropriate testing locations.

02

Trial Pit Excavation

Trial pits are excavated to the required depth (typically 1–2 metres) to reflect proposed soakaway levels.

03

Infiltration Testing

Testing is carried out in accordance with BRE 365 guidance. Multiple tests are undertaken where required to ensure robust, defensible results.

04

Reporting & Analysis

You receive a clear, concise report setting out methodology, results, and infiltration rates suitable for direct use by your drainage engineer.

Not sure if you need testing?
We'll review your site constraints and advise honestly on the most cost and time effective way forward.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
The Results

What You Receive

Everything needed to support planning approval and progress your drainage design.
Edit Pie Chart Report

BRE 365 Compliant Report

Clear documentation following recognised guidance, suitable for planning and Building Control submission.

Short Position

Infiltration Rate Results

Clearly presented data that can be used directly in soakaway calculations and drainage design.

Hand Dug Well

Ground Condition Observations

Notes on soil conditions, groundwater presence, and any constraints relevant to infiltration.

Fast Forward Round

Fast Turnaround

Reports typically delivered within days of testing, not weeks. Keeping your project on track.

The Timescales and Costs

Typical Timescales & Costs

Transparent guidance so you can plan with confidence.
Calendar Plus

Booking Lead Time

Typically 1-2 Weeks

Depending on season and location. Urgent slots often available.

Future

Report Turnaround

3-5 Working Days

From completion of site testing. Faster turnaround available if needed.

British Pound

Pricing

Project Dependent

Based on site location, number of tests required, and access conditions.