
A proposed residential development needed ground conditions, groundwater regime and BRE 365 infiltration rates to support its surface water strategy for planning.
Infiltration potential was confirmed at the proposed locations.
The civil engineers could finalise the drainage design and SuDS documentation for planning on site-specific rates, reported the same day.




Send us the address and what you’re planning. A senior consultant will reply with a quote and the right first step, usually within one working day.