A school site was being considered for redevelopment while remaining in educational use. Localised mining constraints needed understanding before any investigation strategy could be defined, and no detailed layout was yet available.
Mining risk was concentrated in localised areas rather than across the whole site.
The school gained a basis for planning investigation only around areas that could materially affect the scheme, rather than assuming a site-wide mining drilling programme.



Send us the address and what you’re planning. A senior consultant will reply with a quote and the right first step, usually within one working day.