Six trial pits and 12 probe holes showed what the building sits on.
Foundations exposed
The structural engineer had the findings a week after site work.
Report in a week
01

The uncertainty

The structural engineer needed reliable, site-specific information on existing foundations to plan the redevelopment.

02

What we established

Foundation geometry and condition were captured at every location, including defects, construction joints and historic repairs.

03

What changed

The factual report was delivered within one week of completing the works, giving the structural engineer reliable data for the design.

04

How we got there

  • Scanned all exploratory locations with CAT and Genny
  • 6 manually dug trial pits to 1.30 m below ground level
  • 12 probe holes to 0.80 m below ground level
  • Recorded foundation type, depth, dimensions and condition, plus drainage runs, ducts and buried structures
  • Sketched each pit and tagged locations on plan for the structural model
Ben Lawry, Director, Clear Environmental
About the author
Ben Lawry
Director

Ben advises developers, investors and project teams on environmental and ground risks affecting property transactions, planning and development. He has worked in geo-environmental consultancy since 2019.

View profile →
Services on this project
Geotechnical Investigation
More of our work
All projects →

Get a quote for your site.

Send us the address and what you’re planning. A senior consultant will reply with a quote and the right first step, usually within one working day.

✓ Free, with no obligation
✓ You don’t need to know which service you need
✓ Reviewed by a senior consultant
E hello@clearenviro.co.uk