The project team needed to know whether the planning proposals introduced a material contaminated land risk, and whether additional intrusive environmental investigation would be required.
No further works were required in relation to contaminated land, and no remediation was considered necessary for the proposed residential reconfiguration.
The team progressed without commissioning an additional contamination-focused Phase 2, with geotechnical design handled separately: a proportionate planning route based on the actual site risk.