Overview

A former kennels and cattery site in Tilbrook, Cambridgeshire, was being redeveloped for housing. A previous investigation had identified localised contamination, and the developer needed to establish what remedial work was genuinely necessary for the proposed layout.

‍

Clear Environmental reviewed the existing evidence, undertook supplementary investigation and prepared a combined remediation and verification strategy. The work considered the different requirements beneath buildings and hardstanding and within future gardens and soft landscaping.

Scope

  • Reviewed the previous desk study and ground investigation against the proposed residential layout.
  • Undertook supplementary trial pitting and soil testing to assess the areas relevant to future use.
  • Updated the contamination risk assessment and considered whether a site-wide or targeted remedial approach was justified.
  • Specified proportionate measures for gardens and soft landscaping, including suitable imported soils.
  • Defined the inspection, testing and documentation needed for subsequent verification of the remedial works.
Remediation and Verification Strategy - Tilbrook, Cambridgeshire
Remediation and Verification Strategy - Tilbrook, Cambridgeshire

Outcome

Clear combined the supplementary investigation and remediation strategy into a defined scope for making the site suitable for residential use. Considering the evidence alongside the proposed layout showed that site-wide remediation was not justified: measures could focus on gardens and soft landscaping, with building and hardstanding cover addressing the relevant exposure risk elsewhere.

‍

The developer had a practical basis for planning the remaining works and understanding the verification evidence needed for regulatory review. The strategy established what needed to be delivered and demonstrated, rather than allowing a localised finding to dictate remediation across the whole site.