
A private developer needed infiltration rates at the proposed drainage locations to satisfy SuDS requirements for a new-build residential scheme.
Sandy gravel strata gave favourable conditions for infiltration.
Completed in a single site visit and reported shortly after, allowing the design team to finalise the drainage layout and proceed with planning.




Send us the address and what you’re planning. A senior consultant will reply with a quote and the right first step, usually within one working day.